|
|
|
|
|
|
|
![]()
¡@ |
Since Ching Dynasty Liu Ming Chuan established Directorate General of Taiwan Railroad Business, it has been ten decades. Parts of branch line stopped because of time. The Lengthwise Past Mountain-line which plays an important role on transportation between north and south finished even tracks in September, 1997. The odd track line between San Yi and Feng Yuan became a history. However, this section has transported for one hundred years. Besides plentiful natural landscape resources along the line, there¡¦re broken bridge ruins, railway stations, stuff about railway transportation, etc. All of them have a historic meaning and can¡¦t be substitute. It¡¦s true that it is going to be closed, so the collection of documents and history and reserve of it is an important thing. Scenery Exhibition of Past Mountain-line needs to borrow hundreds of the old photos, cultural relics about railroads, a model of train, documents and history in writing to show the charms of railways again. |
![]() ![]() |